CASE STUDIES

Cameron Road, Tauranga

Using a portable asphalt manufacturing plant, asphalt was produced at Taotaoroa and hauled over the Kaimai’s for a road widening project in Tauranga.

VIEW CASE STUDY

Auckland Road Maintenance Alliance

The development of Emulsion Treated Basecourse involves reusing existing salvaged road materials for reuse. Through the ETB process 100% of reclaimed material is recycled and wastage of material minimised.

VIEW CASE STUDY

Hampton Downs Race Track

No race track in the world has ever been surfaced with a single layer thin Asphaltic Concrete surface, however due to funding constraints and underlying sub-grade conditions a new race track mix formula was produced by Asphalt Products Limited for the Hampton Downs Motorsport race track.

VIEW CASE STUDY

Newmarket Viaduct

The production of a ‘blonde asphalt’ for the resurfacing of the Newmarket Viaduct extended the design life of the Viaduct. In order to manufacture the ‘blonde asphalt’ a customised production process was put in place.

VIEW CASE STUDY